Cryofreezer Installation

Click on any image for a larger view.


After relocating the emergency shower, the Genetic Resources Repository freezer was installed in Dickinson Hall. Installation included calibrating and setting the computer to maintain the freezer's liquid nitrogen level. Museum employees operated and tested the freezer for three weeks before loading the first specimens.

Check the contents of the collection!